Aries control room during commissioning

Experience 03

Aries Clean Technology: Plant Commissioning and Startup

Aries Clean Technology engaged EDYMAC to support commissioning of its redesigned and modified First-of-a-Kind (FOAK) facility in Linden, New Jersey, which gasifies bio-sludge into syngas.

Industry
Energy from Waste (EfW)
Project Type
Bio-sludge to energy facility
Engagement
Operational Readiness, Commissioning
Stage at Entry
Construction turnover => first operations
Location
Linden, NJ
Timeline
2023 - 2025
  • Biosolids
  • Gasification
  • Syngas
  • EfW
  • FOAK

Aries Clean Technology engaged EDYMAC to support commissioning of its redesigned and modified First-of-a-Kind (FOAK) facility in Linden, New Jersey, which gasifies bio-sludge into syngas.

EDYMAC supported the transition from construction turnover through commissioning, startup, and initial operations. The engagement included equipment readiness, commissioning planning, operator training, SOP development, and hands-on operational support.

EDYMAC reviewed and updated operating procedures, aligned equipment turnover with commissioning requirements, and verified system readiness—with particular attention to instrumentation and controls, including significant modifications to the as-delivered control system.

Working directly with the operations team, EDYMAC provided hands-on training in field equipment, plant operating principles, troubleshooting, and HMI operation.

The plant successfully gasified biosolids in Q1 2024. EDYMAC continued supporting operations and troubleshooting as the facility moved from startup toward sustained operation.

Aries Clean Technology control room

From construction turnover to operation.

EDYMAC brings structure and discipline to the most volatile period of a project—the transition from a completed construction project to an operating asset.

Construction Turnover

Drive system completion and readiness for operational service. Verify documentation, close critical punch-list items, and confirm equipment and systems are ready before transferring ownership from construction to operations.

Commissioning

Bring systems online in a controlled, sequential sequence, verifying equipment function, safety systems, instrumentation, and control responses under actual operating conditions.

Stabilization

Guide initial operations, troubleshoot emerging issues, and establish repeatable operating practices as the plant moves from first runs toward stable performance.

Ongoing Support

Remain engaged as needed to troubleshoot operating challenges, optimize performance, strengthen the operating team, and support the transition to sustained operations.

Hands-on through every step

Hands-on operational leadership and coaching across turnover, commissioning, and the volatile first runs — not advice from the sidelines but boots on the ground.

Guided construction turnover

Coordinated the transition from construction to operations, verifying system readiness, documentation, and personnel capability before systems were placed into service.

Rebuilt the Control Scheme

Identified limitations in the as-delivered control architecture that constrained reliable operation. Worked with the automation designer to develop, test, and implement a modular control approach combining sequenced operations with continuously operating equipment.

Coached and Trained the Operations Team

Provided hands-on training in field operations, equipment behavior, troubleshooting, and HMI operation to build operator confidence and establish the foundation for reliable day-to-day performance.

Led Initial Plant Startup

Supported initial plant operations in real time, resolving startup challenges as they emerged and helping transition the facility from commissioning into routine operations.

Technology becomes an asset only when the people, controls, and operating discipline are ready to run it.

What Happened at the Plant Floor

Asset Operationalization

Successfully and safely transitioned the asset from construction into operational service.

Control System Validation

Worked with the automation designer to replace an overly constrained control configuration with a modular architecture that balanced sequenced operations with continuously operating equipment.

Cross-Functional Execution

Worked alongside management, engineering, operations, and equipment vendors to identify critical issues, resolve them in real time, and keep commissioning moving forward.

Sustained Operational Support

Continued supporting the facility as operations progressed, providing troubleshooting and operating guidance through a combination of remote support and on-site engagement.

A successful startup isn't the finish line. It's the beginning of operational discipline. EDYMAC helped turn a modified FOAK design into a functioning operating asset—closing the gap between construction, controls, equipment, and the people responsible for running the plant.

Operational Stabilization & FOAK Troubleshooting